3.2.1_14
YP10B Nº 3. Concrete Loop II
Pedestrian Bridge. New
Author
Pedro P. Arroyo Alba
CA-Group. Ning Li
Shanghai Xiandai Architecture Design (Group) Co. Ltd.
China Construction Engineering Fifth Division
Angelo Piccolella (aerial view)
Shanghai Jiading Newcity Development Co. Ltd.
Commission
Design Development, Construction Drawings, Site Supervision
2009/06
2010/02-2011/10
M 18
English, Chinese
sqm 1.920-sqm 720
EUR 341.000